Someone who finishes a job in a hours works at a rate of a1 of the job per hour. Rates of people (or pipes) working together add, so a1+b1=t1, where t is the time together.
Recognize the problem
Trigger words: working together, alone it takes, fills in … hours, drains, how long will it take both. Two or more agents doing the same job at different speeds.
Set it up
1. RatesEach agent's rate is 1 job divided by its time alone: a1, b1.
2. TogetherThe combined rate is t1, where t is the time working together.
3. EquationRates add: a1+b1=t1. Something undoing the work (a drain) is subtracted.
4. UnknownMark which of a, b, t is unknown; the others are given.
5. Partial workIf someone works only part of the time, their share is rate × time worked, and the shares add up to 1 job.
Interpret the result. Give the time in the problem's units, with a sensible rounding or as hours and minutes. Working together must be faster than the fastest agent alone, and a drain must make the fill slower.
Worked examples
Example 1 · two pipes together
unknown t
pipe A fills a tank in 6 h, pipe B in 3 h
61+31=t1
21=t1⇒t=2 h
faster than either alone
Example 2 · one time unknown
solve for b
one painter takes 5 h; together they take 3 h; the second alone?
51+b1=31
b1=152⇒b=7.5 h
Example 3 · a drain left open
subtract
a tap fills a tank in 4 h, the drain empties it in 6 h
41−61=t1
121=t1⇒t=12 h
See it happen
Think in "jobs per hour". A 6-hour pipe does 61 of the tank each hour and a 3-hour pipe 62; together 63, half a tank per hour, so two hours. Times do not add, rates do.
Common mistakes
Adding the times
✗6+3=9 h together
✓add the rates: 61+31=21, so 2 h
Averaging the times
✗26+3=4.5 h
✓together must be faster than the faster pipe: 2 h